chore(deps): update dependency ava to v7 #3979
test.yml
on: pull_request
Matrix: test_matrix
test_dev
33s
test
3s
Annotations
10 errors
|
test_matrix (20.8.1, ubuntu-latest)
Process completed with exit code 1.
|
|
test_matrix (20.8.1, macos-latest)
The strategy configuration was canceled because "test_matrix._20_8_1_ubuntu-latest" failed
|
|
test_matrix (20.8.1, macos-latest)
The operation was canceled.
|
|
test_matrix (20, windows-latest)
The strategy configuration was canceled because "test_matrix._20_8_1_ubuntu-latest" failed
|
|
test_matrix (20, windows-latest)
The operation was canceled.
|
|
test_matrix (20.8.1, windows-latest)
The strategy configuration was canceled because "test_matrix._20_8_1_ubuntu-latest" failed
|
|
test_matrix (20.8.1, windows-latest)
The operation was canceled.
|
|
test_matrix (21, windows-latest)
The strategy configuration was canceled because "test_matrix._20_8_1_ubuntu-latest" failed
|
|
test_matrix (21, windows-latest)
The operation was canceled.
|
|
test
Process completed with exit code 1.
|