fix(deps): update pytest-cov requirement from <7,>=2 to >=2,<8 #160
test.yml
on: pull_request
tests
/
🧪 Linting
1m 23s
Matrix: tests / 🧪 Testing
tests
/
...
/
Auto-merge Dependabot PR
3s
Annotations
9 errors
|
tests / 🧪 Testing (3.13)
Process completed with exit code 1.
|
|
tests / 🧪 Testing (3.11)
Process completed with exit code 1.
|
|
tests / 🧪 Testing (3.11)
The strategy configuration was canceled because "tests.test_matrix._3_13" failed
|
|
tests / 🧪 Testing (3.12)
Process completed with exit code 1.
|
|
tests / 🧪 Testing (3.12)
The strategy configuration was canceled because "tests.test_matrix._3_13" failed
|
|
tests / 🧪 Testing (3.9)
The operation was canceled.
|
|
tests / 🧪 Testing (3.9)
The strategy configuration was canceled because "tests.test_matrix._3_13" failed
|
|
tests / 🧪 Testing (3.10)
The operation was canceled.
|
|
tests / 🧪 Testing (3.10)
The strategy configuration was canceled because "tests.test_matrix._3_13" failed
|