Skip to content

Fix - transfer of switch parameters fails (changed to bool in interna… #128

Fix - transfer of switch parameters fails (changed to bool in interna…

Fix - transfer of switch parameters fails (changed to bool in interna… #128

Triggered via push October 8, 2025 15:46
Status Failure
Total duration 51s
Artifacts

build.yml

on: push
Matrix: build-and-test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build-and-test (8.0)
Process completed with exit code 1.
build-and-test (8.0)
The current .NET SDK does not support targeting .NET 10.0. Either target .NET 9.0 or lower, or use a version of the .NET SDK that supports .NET 10.0. Download the .NET SDK from https://aka.ms/dotnet/download
build-and-test (8.0)
The current .NET SDK does not support targeting .NET 10.0. Either target .NET 9.0 or lower, or use a version of the .NET SDK that supports .NET 10.0. Download the .NET SDK from https://aka.ms/dotnet/download
build-and-test (8.0)
The current .NET SDK does not support targeting .NET 10.0. Either target .NET 9.0 or lower, or use a version of the .NET SDK that supports .NET 10.0. Download the .NET SDK from https://aka.ms/dotnet/download
build-and-test (8.0)
The current .NET SDK does not support targeting .NET 10.0. Either target .NET 9.0 or lower, or use a version of the .NET SDK that supports .NET 10.0. Download the .NET SDK from https://aka.ms/dotnet/download
build-and-test (6.0)
The operation was canceled.
build-and-test (6.0)
The strategy configuration was canceled because "build-and-test._8_0" failed